With a leading presence across the UAE and Qatar – and a production capacity of over 1.8 million cubic metres per annum – Al Ghurair Construction Readymix is perfectly placed to serve the ever-growing needs of complex infrastructure projects in the Middle East.
Ever since the company first marked its foray in the industry as Arabian Mix in 1985, the production and supply of readymix concrete has been a key focus area.
of expertise in readymix
m3 of ready-mixed concrete produced per annum
major projects delivered till date
pumps
rail project
m3 of concrete delivered
computerised batch plants
Al Ghurair Construction Readymix is the first readymix manufacturing company in the GCC to utilise the most advanced technology in batching plant control system, referred to as SIMMA Electronics CMS (Concrete Management Systems).
Production quality & control is ensured through the expertise of qualified technical staff in a state-of-the art testing laboratory. In addition, the adoption of the quality assurance policy substantially improves outcomes in various areas of operation.
Certifications such as ISO 9001, ISO 14001, ISO 45001:2018 and the Certificate of Conformity by Dubai Municipality / DCLD confirm the adherence and implementation of strict quality control, environmental protection and safety standards
Acknowledged by Guinness World Records as the world's longest fully-automated metro network, Dubai Metro is the first urban train network in the Arabian Peninsula. From the outset, Al Ghurair Construction Readymix implemented health, safety & quality systems in line with international standards, backed by a high calibre team.
Total Concrete Quantity: 2.65 million m3